Regulations and Applications

Regulations and Bylaws

WATER/SEWER UTILITY APPLICATIONS 

For water/sewer services - please follow the steps below:

Step 1: Pre - Application Meeting to confirm data 

Step 2: Request water or sewer service plan review. 

  • Step 2: Request water or sewer service plan review with flow rates

    • see online form below. 

    • The service plan stamped by Professional Engineer and must include confirmed size and locations of current utilities as well as proposed sizes and locations

    • Flow rate calculation showing current and proposed flows based on title 5.

    • A $2000 check must be written out to the Town of Maynard with a subject of "water sewer review " as a deposit. The engineer review will not start until we have this deposit. If your review costs less than $2000, you will be notified and refunded the balance. 

Step 4: Approval of plan

  • this will be written approval after review from a member of DPW staff

Step 5: Water/sewer service Installation request

  • this step includes other applications such as the road opening permit and utility connection fees